MAS is able to create an air turnover unit by utilizing a vertical unit with AC prop fans and VFDs.
Heat can be supplied by unit heaters throughout the space or we can put a hot water coil in the unit. Gas heat is currently unavailable with this layout at this high capacity.
Comentarios