This 100% OA energy recovery unit reaches over 80% sensible effectiveness with an Accubloc system. This unit is outdoor rated as a skyline from Daikin, no specials required. Estimated MAS build time is about 3-4 weeks. With a Daikin quick ship (assuming 18 weeks or so), MAS can ship this unit in 20-22 weeks.
Patrick Celentano
Comments