Modifications | MAS 2019

In a pinch?

We won't keep you long.  MAS has built a very quick, efficient, and hard working team to drastically lower our lead times from the past. Here are the modifications we can provide!

Q-PAC

1 week lead time

Q-PAC is our fastest install, we can install an array in just hours. It typically takes us anywhere between 4-8 weeks to receive the arrays. Multiple arrays will vary our install time, for example we could do (6) arrays in 2 weeks.

GAS HEAT

1 week lead time

Indirect Fired (up to 5,000MBH) and Direct Fired (limited options)

It takes us between 3-6 weeks to receive a heater. Once we have the cabinet and heater, we can install and ship within a week. Each additional heater will add a few business days to lead time.

ELECTRIC HEAT

1 week lead time

Finned tubular, open coil, SCR, higher KAIC ratings

It takes us 3-4 weeks to receive a heater. We can install and turn around in 1 week. Each additional heater will add a day or two to lead time.

ENERGY RECOVERY UNITS

1-2 week lead time

Enthalpy plates, sensible plates, wheels, heat pipes

In general, we can build a single ERV (indoor or outdoor, any type of heat exchanger) in 1-2 weeks.  These are really popular modifications for us as we can configure these units as standard with zero specials.

HEAT PIPES 

1 week lead time

Wrap around and side-by-side, passive and controllable.

 

It takes us 6-10 weeks to receive a heat pipe. We can install and turn around in 1 week. Each additional heat pipe will add a day or two to lead time.

DIRECT DRIVE PLENUM FANS

2 week lead time

Various options on direct drive plenum fans, including explosion proof motors.  Takes us roughly 4-6 weeks to receive our components (8 weeks for explosion proof).